22 0631_22 0630_20160512_032444.mp4
0 ft. - Upstream Manhole, Survey Begins - 22 0631
2 ft. - General Observation - Magnesium hydroxide coating 65% start
2 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
4.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
50.6 ft. - Roots Medium Lateral, at 10 o'clock, 25 %, within 8 inches of joint: YES
216.5 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
| Distance | Code | Observation |
|---|---|---|
| 50.5 | TFA | — |
| 322.4 | AMH | 22 0630 |
| 2 | MGO | Magnesium hydroxide coating 65% start |
| 318 | SAV | — |
| 0 | MWM | — |
| 4 | TFC | — |
| 152.2 | TFA | — |
| 50.6 | RML | — |
| 2 | SAV | — |
| 4.2 | DAGS | — |
| 0 | AMH | 22 0631 |
| 277.1 | TFA | — |
| 230.3 | TFC | — |
| 148.6 | TFA | — |
| 301.6 | TFA | — |
| 216.5 | TFA | — |
| 86.1 | TFC | — |
| 0 | MWL | — |
| 52 | TFC | — |
| 0 | VC | — |
| 319.6 | DAGS | — |
| 319.6 | MGO | Magnesium hydroxide coating finish |
| 90.8 | TFC | — |