22 0639_22 0638_20160512_011314.mp4
0 ft. - Downstream Manhole, Survey Begins - 22 0638
0 ft. - Water Level, 40 %of cross sectional area
3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"
29.3 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"
108.2 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
124.5 ft. - General Observation - Magnesium hydroxide coating finish
| Distance | Code | Observation |
|---|---|---|
| 126.2 | VC | — |
| 2 | MGO | Magnesium hydroxide coating start |
| 108.2 | TFA | — |
| 0 | AMH | 22 0638 |
| 3 | TFC | — |
| 125 | SAV | — |
| 124.5 | MGO | Magnesium hydroxide coating finish |
| 79.6 | TFC | — |
| 63.7 | TFC | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 126.2 | AMH | 22 0639 |
| 2 | SAV | — |
| 29.3 | TFC | — |