22 0637_22 0636_20160512_003335.mp4
0 ft. - Upstream Manhole, Survey Begins - 22 0637
0 ft. - Water Level, 15 %of cross sectional area
2 ft. - General Observation - Magnesium hydroxide coating 75% start

3.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
11.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"
48.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 38.8 | TFA | — |
| 52.1 | MGO | CONNECTION AT THE MH 9 O'CLOCK |
| 0 | MWM | — |
| 3.9 | DAGS | — |
| 0 | AMH | 22 0637 |
| 3.9 | SAV | — |
| 0 | MWL | — |
| 11.1 | TFC | — |
| 2 | MGO | Magnesium hydroxide coating 75% start |
| 52.1 | AMH | 22 0636 |
| 48.7 | SAV | — |
| 48.7 | DAGS | — |