Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2016, 05:39 PM
  • 22 0622_22 0621_20160512_115012.mp4

Date
05/12/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P16970
Time
10:39 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3250
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
SIPHON
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0622
Downstream MH
22 0621
Dir. of Survey
Downstream
Length Surveyed
129.3 ft.
Total Length
129.3 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
72
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
72
Pipe schematic from manhole 22 0622 to 22 0621
MH: 22 0622MH: 22 0621downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06220 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK2 ft. MGO - General Observation - Magnesium hydroxide coating 55% start5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"57.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"72.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"100.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"116.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"126.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish129.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0621

Observation photos (5)

  • Upstream Manhole, Survey Begins - 22 0622

    0 ft. - Upstream Manhole, Survey Begins - 22 0622

  • General Observation - CONNECTION AT THE MH 9 O'CLOCK

    0 ft. - General Observation - CONNECTION AT THE MH 9 O'CLOCK

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"

    5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"

    116.5 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"

Observations (14)

DistanceCodeObservation
5TFC
126.4SAV
72.7TFC
0AMH22 0622
0MWM
0MWL
0MGOCONNECTION AT THE MH 9 O'CLOCK
100.5TFC
57.5TFC
2MGOMagnesium hydroxide coating 55% start
5SAV
116.5TFC
9.9TFC
129.3AMH22 0621

Properties (4)

additional_info
SC305349
custom_field_two
3
customer
LACSD
datetime
2016-05-12T10:39:44-07:00