Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2016, 09:45 AM
  • C 0360_C 0359_27042016_024641.mp4

Date
04/27/2016
W/O
563382
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00140
PipeID
P09823
Time
2:45 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3329
Sewer Name
C JOINT OUTFALL C - UNIT 8B
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
WO_563382_TV19020_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
C 0360
Downstream MH
C 0359
Dir. of Survey
Downstream
Length Surveyed
498.2 ft.
Total Length
498.2 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
493
O&M Index
2
O&M Quick
2S00
O&M Rating
198
Overall Index
2
Overall Quick
Overall Rating
691
Pipe schematic from manhole C 0360 to C 0359
MH: C 0360MH: C 0359downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 03600 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start498.2 ft. MGO - General Observation - RUN LIST STATES MH AT 519'.498.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish498.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish498.2 ft. AMH - Downstream Manhole, Survey Ends - C 0359498.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
498.2MGORUN LIST STATES MH AT 519'.
498.2DAGS
498.2SAP
0AMHC 0360
2SAP
7.2SSS
498.2AMHC 0359
0MGOCOCKROACHES IN MANHOLE
0MWL
2DAGS
498.2SSS
0MWM

Properties (4)

additional_info
SC305605
custom_field_two
2
customer
LACSD
datetime
2016-04-27T02:45:56-07:00