Wastewater/Activity/PacpInspection/1.0Apr 27, 2016, 07:14 AM
  • C 0362_C 0361_27042016_001608.mp4

Date
04/27/2016
W/O
563382
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00140
PipeID
P09825
Time
12:14 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3329
Sewer Name
C JOINT OUTFALL C - UNIT 8B
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
WO_563382_TV19020_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
C 0362
Downstream MH
C 0361
Dir. of Survey
Downstream
Length Surveyed
715.8 ft.
Total Length
715.8 ft.
Structural Index
3
Structural Quick
3[2[
Structural Rating
704
O&M Index
2
O&M Quick
3P2[
O&M Rating
536
Overall Index
2
Overall Quick
Overall Rating
1240
Pipe schematic from manhole C 0362 to C 0361
MH: C 0362MH: C 0361downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - C 03622 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start12 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start294.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start713 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish713 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish713 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish713 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish715.8 ft. AMH - Downstream Manhole, Survey Ends - C 0361

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    12 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    294.1 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWL
294.1DSZ
2SSS
0MWM
713DSZ
713SSS
713DAGS
12SAP
715.8AMHC 0361
0MGOCOCKROACHES IN MANHOLE
2DAGS
0AMHC 0362
713SAP

Properties (4)

additional_info
SC305605
custom_field_two
2
customer
LACSD
datetime
2016-04-27T00:14:43-07:00