Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 27, 2016, 06:47 AM
  • C 0363_C 0362_26042016_234854.mp4

Date
04/26/2016
W/O
563382
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00140
PipeID
P09826
Time
11:47 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3329
Sewer Name
C JOINT OUTFALL C - UNIT 8B
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
WO_563382_TV19020_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
C 0363
Downstream MH
C 0362
Dir. of Survey
Downstream
Length Surveyed
580.9 ft.
Total Length
580.9 ft.
Structural Index
3
Structural Quick
3k00
Structural Rating
663
O&M Index
2
O&M Quick
3J2V
O&M Rating
398
Overall Index
3
Overall Quick
Overall Rating
1061
Pipe schematic from manhole C 0363 to C 0362
MH: C 0363MH: C 0362downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03632 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start46.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296.4 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start578.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish578.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish578.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish578.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish580.9 ft. AMH - Downstream Manhole, Survey Ends - C 0362580.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    46.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    580.9 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
46.6SAP
296.4DSZ
580.9AMHC 0362
0MWL
2DAGS
0MWM
578.6SAV
0AMHC 0363
580.9MGOCOCKROACHES IN MANHOLE
578.6DSZ
578.6DAGS
2SAV
578.6SAP

Properties (4)

additional_info
SC305605
custom_field_two
2
customer
LACSD
datetime
2016-04-26T23:47:43-07:00