Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2016, 08:35 AM
  • C 0368_C 0367_26042016_013647.mp4

Date
04/26/2016
W/O
563382
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00140
PipeID
P09831
Time
1:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3326
Sewer Name
C JOINT OUTFALL C - UNIT 8B
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
WO_563382_TV19020_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
C 0368
Downstream MH
C 0367
Dir. of Survey
Downstream
Length Surveyed
466.7 ft.
Total Length
466.7 ft.
Structural Index
3
Structural Quick
3R2R
Structural Rating
465
O&M Index
2
O&M Quick
2R00
O&M Rating
186
Overall Index
2
Overall Quick
Overall Rating
651
Pipe schematic from manhole C 0368 to C 0367
MH: C 0368MH: C 0367downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - C 03682 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start427.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"466.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish466.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish466.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish466.7 ft. AMH - Downstream Manhole, Survey Ends - C 0367

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2SAP
2DAGS
0MWL
466.6SSS
2SSS
0MWM
466.6DAGS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
466.7AMHC 0367
427.3TBA
0AMHC 0368
466.6SAP

Properties (4)

additional_info
SC305604
custom_field_two
2
customer
LACSD
datetime
2016-04-26T01:35:55-07:00