- Date
- 04/18/2018
- W/O
- 0700973
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00635
- PipeID
- P12060
- Time
- 1:23 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0825
- Sewer Name
- 15 TYLER AVENUE RELIEF TRUNK
- City
- EL MONTE
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 17
- Purpose
- Capital Improvement Program Assesment
- Project
- 20180417MDM_TYLER_AVENUE_RELIEF_TRUNK
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 10 in.
- Upstream MH
- 15 0151
- Downstream MH
- 15 0113
- Dir. of Survey
- Upstream
- Length Surveyed
- 32.3 ft.
- Total Length
- 32.3 ft.
- Structural Index
- 4
- Structural Quick
- 5211
- Structural Rating
- 11
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 4
- Overall Quick
- —
- Overall Rating
- 11
Pipe schematic from manhole 15 0151 to 15 0113 Observation photos (4)

4 ft. - Broken Soil Visible, from 03 to 09 o'clock, within 8 inches of joint: YES - MODERATE CIRCUM

4 ft. - Joint Offset Medium

4 ft. - Broken, from 03 to 09 o'clock, within 8 inches of joint: YES - MODERATE CIRCUM

8 ft. - General Observation - 8" VCP