Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 6, 2016, 07:16 AM
Date
04/06/2016
W/O
563407
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00327
PipeID
P08353
Time
12:16 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3245
Sewer Name
A JOA-1A SOUTH HAWTHORNE-WARFIELD AV EXTENSION
City
LAWNDALE, CA 90260
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
19
Purpose
Routine Assessment
Project
WO_563407_TV05154_APRIL2016
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
A 0571
Downstream MH
A 0572
Dir. of Survey
Upstream
Length Surveyed
260.8 ft.
Total Length
260.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole A 0571 to A 0572
MH: A 0571MH: A 0572upstream0 ft. AMH - Upstream Manhole, Survey Ends - A 05720 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish31.2 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"49.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.4 ft. H - Hole, at 02 o'clock, within 8 inches of joint: NO102.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 4"105.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"128.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"150.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"209.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"248 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"250.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start260.8 ft. MWL - Water Level, 15 %of cross sectional area260.8 ft. AMH - Downstream Manhole, Survey Begins - A 0571260.8 ft. MWM - Water Mark, 20 %of cross sectional area

Observations (20)

DistanceCodeObservation
0MWL
155.3TFA
0AMHA 0571
229.6TBC
260.8AMHA 0572
51.6TFC
159.4H
12.8TFC
192.8TFA
96.5TFA
109.9TFC
0MWM
211TFC
9.9TF
2DAGS
59.7TFA
258.3DAGS
260.8MGOLATERAL AT MH 3 OCLOCK
132.5TFC
158.7TB

Properties (4)

additional_info
SC305337
custom_field_two
4
customer
LACSD
datetime
2016-04-06T00:16:19-07:00