- Date
- 12/29/2016
- W/O
- 613609
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00763
- PipeID
- P15522
- Time
- 10:39 PM
- Certificate
- U-508-7069
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K4110
- Sewer Name
- 21 DISTRICT #21 OUTFALL TRUNK
- City
- POMONA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 21
- Page No.
- 14
- Purpose
- Routine Assessment
- Project
- WO_613609_TV21044_JAN2017
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 27 in.
- Width
- 27 in.
- Upstream MH
- 21 0325
- Downstream MH
- 21 0324
- Dir. of Survey
- Downstream
- Length Surveyed
- 59.1 ft.
- Total Length
- 59.1 ft.
- Structural Index
- 4
- Structural Quick
- 5A3A
- Structural Rating
- 83
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 4
- Overall Quick
- —
- Overall Rating
- 83
Pipe schematic from manhole 21 0325 to 21 0324 Observation photos (2)

6.6 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

7.2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start