30 0048_30 0047_4112018_030400.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING CONCRETE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
4 ft. - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE
4 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
6 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
8 ft. - General Observation - MAG COAT 80% START
23 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
62 ft. - General Observation - MAG COST 25% START
| Distance | Code | Observation |
|---|---|---|
| 44.2 | MWL | — |
| 89.1 | DSZ | SLUDGE |
| 4 | DSZ | SLUDGE |
| 23 | SRV | CIRCUM REBAR |
| 131.5 | DSZ | SLUDGE |
| 44.2 | MWM | — |
| 2 | SSS | SWOLLEN BLISTERING CONCRETE |
| 29.8 | DSZ | SLUDGE |
| 45.2 | SRV | CIRCUM REBAR |
| 62 | MGO | MAG COST 25% START |
| 2 | SAM | SEVERE AGG |
| 293.4 | SAM | SEVERE AGG |
| 293.4 | SSS | SWOLLEN BLISTERING CONCRETE |
| 293.8 | AMH | 3:30AM |
| 44.2 | MGO | MAG COAT 80% FINISH |
| 0 | MWM | — |
| 6 | SRV | CIRCUM REBAR |
| 4 | SRV | CIRCUM REBAR |
| 0 | MWL | — |
| 0 | AMH | 3:00AM |
| 8 | MGO | MAG COAT 80% START |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |