05 1479_05 1478_492018_003401.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED
47.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
56.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRET SEVERE AGG ATTACHED
79.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE MULTILAYER SEVERE AGG ATTACHED
207.3 ft. - Deposits Settled Other, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES, Start - METAL SEWER SNAKE
220 ft. - Deposits Settled Other, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES, Finish - METAL SEWER SNAKE
233.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 207.3 | DSZ | METAL SEWER SNAKE |
| 0 | AMH | 12:30AM |
| 0 | MWM | — |
| 2 | SSS | MULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED |
| 69.1 | TFC | Capped |
| 0 | MWL | — |
| 56.9 | SSS | PEELING CONCRET SEVERE AGG ATTACHED |
| 117.8 | TFC | Capped |
| 169.9 | TF | Active |
| 20.1 | TFC | Capped |
| 342.3 | SSS | MULTI LAYER PEELING CONCRETE SEVERE AGG ATTACHED |
| 218.1 | TFC | Capped |
| 321.8 | TFC | Capped |
| 220 | DSZ | METAL SEWER SNAKE |
| 263.5 | TF | Active |
| 233.1 | SSS | PEELING CONCRETE |
| 47.2 | SSS | PEELING CONCRETE |
| 270.1 | TFC | Capped |
| 327.3 | TF | Active |
| 214.7 | TF | Active |
| 342.7 | AMH | 1:15AM |
| 342.3 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 157 | TFC | Capped |
| 79.8 | SSS | PEELING CONCRETE MULTILAYER SEVERE AGG ATTACHED |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |