30 0069_30 0068_472018_113345.mp4
0 ft. - Downstream Manhole, Survey Begins - 11:30 AM
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
14.5 ft. - Material Change, Vitrified clay pipe
14.9 ft. - General Photograph
17.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
43.5 ft. - Crack Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES
45.4 ft. - Roots Fine Joint, from 11 to 12 o'clock, within 8 inches of joint: YESR
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 11:30 AM |
| 0 | MWL | — |
| 2 | SAP | — |
| 47.4 | SSS | — |
| 47.4 | CM | — |
| 17.4 | CM | — |
| 47.4 | SAP | — |
| 0 | MWM | — |
| 14.9 | MGP | — |
| 2 | SAV | — |
| 2 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 48 | AMH | 11:46 AM |
| 14.5 | MMC | — |
| 45.4 | RFJ | — |
| 47.4 | SAV | — |
| 2 | SSS | — |
| 43.5 | CS | — |