Wastewater/Activity/PacpInspection/1.0Mar 20, 2018, 05:35 AM
  • 20 0229_20 0228_19032018_225032.mp4

Date
03/19/2018
W/O
690551
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00735
PipeID
P19196
Time
10:35 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5491
Sewer Name
20 AVENUE "Q" TRUNK
City
PALMDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
WO_690551_TV20019_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0229
Downstream MH
20 0228
Dir. of Survey
Downstream
Length Surveyed
335.9 ft.
Total Length
335.9 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
198
Pipe schematic from manhole 20 0229 to 20 0228
MH: 20 0229MH: 20 0228downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 02290 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start40.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"43.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"92.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"95.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"139.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"142 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"190.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"194.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"239.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"242.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"291.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"294.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"321.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"325 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"333.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK335.9 ft. AMH - Downstream Manhole, Survey Ends - 20 0228

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
325TFC
194.1TFC
139.1TFC
95.9TFC
0AMH20 0229
239.6TFC
0MWL
335.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
92.9TFC
335.9AMH20 0228
190.9TFC
294.7TFC
242.8TFC
291.6TFC
321.8TFC
2SAP
43.9TFC
40.6TFC
142TFC
333.5SAP

Properties (4)

additional_info
SC358499
custom_field_two
2
customer
LACSD
datetime