- Date
- 03/20/2018
- W/O
- 690447
- Weather
- Light Rain
- Operator/Surveyor
- S. LOPEZ
- Sewer ID
- Z00745
- PipeID
- P19071
- Time
- 10:49 PM
- Certificate
- U-111-11880
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K5493
- Sewer Name
- 20 TRUNK "D"
- City
- PALMDALE
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 20
- Page No.
- 06
- Purpose
- Routine Assessment
- Project
- WO_690447_TV20029_MAR2018
- Sewer Type
- Gravity
- Material
- NRCP
- Shape
- Circular
- Height
- 12 in.
- Width
- 12 in.
- Upstream MH
- 20 0148
- Downstream MH
- 20 0147
- Dir. of Survey
- Downstream
- Length Surveyed
- 332.3 ft.
- Total Length
- 332.3 ft.
- Structural Index
- 3
- Structural Quick
- 3L2K
- Structural Rating
- 322
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 322
Pipe schematic from manhole 20 0148 to 20 0147 Observation photos (2)

2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

19.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start