Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 14, 2017, 07:09 AM
  • 02 1171_02 1170 _14072017_000947.mp4

Date
07/14/2017
W/O
646463
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00350
PipeID
P04565
Time
12:09 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4648
Sewer Name
02 GARFIELD AVENUE TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
WO_646463_TV02336_JUL2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 1171
Downstream MH
02 1170
Dir. of Survey
Downstream
Length Surveyed
299.7 ft.
Total Length
299.7 ft.
Structural Index
3
Structural Quick
5242
Structural Rating
192
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
192
Pipe schematic from manhole 02 1171 to 02 1170
MH: 02 1171MH: 02 1170downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 11710 ft. MGO - General Observation - CONNECTION AT MH 5 O'CLOCK0 ft. MGO - General Observation - PIPE IS 8 OR 10"0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK3.9 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES6.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES10 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"65.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"167.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"218.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"283 ft. B - Broken, from 09 to 04 o'clock, within 8 inches of joint: YES292.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish292.5 ft. B - Broken, from 09 to 04 o'clock, within 8 inches of joint: YES295.4 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES299.7 ft. AMH - Downstream Manhole, Survey Ends - 02 1170

Observation photos (5)

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    3.9 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    6.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 09 to 04 o'clock, within 8 inches of joint: YES

    292.5 ft. - Broken, from 09 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    295.4 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
0MWL
0MWM
0AMH02 1171
10CM
283B
3.9FM
167.3TFC
0MGOCONNECTION AT MH 5 O'CLOCK
292.5CM
116.1TFC
13.7TFC
0MGOPIPE IS 8 OR 10"
267.4TF
65.3TFC
6.3CM
292.5B
0MGOCONNECTION AT MH 6 O'CLOCK
295.4FM
299.7AMH02 1170
218.5TFC

Properties (4)

additional_info
SC345508
custom_field_two
1
customer
LACSD
datetime
2017-07-14T00:09:32-07:00