Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2017, 08:10 AM
  • A 0507_A 0506_7262017_013913.mp4

Date
07/26/2017
W/O
0635420
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00315
PipeID
P07743
Time
1:10 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0603
Sewer Name
A JOA-1A DISTRICT 5 INTERCEPTOR
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
20
Purpose
Routine Assessment
Project
20170724MDM_JOA_1A_DISTRICT_5_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Upstream MH
A 0507
Downstream MH
A 0506
Dir. of Survey
Downstream
Length Surveyed
251.6 ft.
Total Length
251.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole A 0507 to A 0506
MH: A 0507MH: A 0506downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:25AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 30 %of cross sectional area8 ft. MGO - General Observation - FR POLY LINE8.1 ft. MGO - General Observation - WHITE BUILDUP ON PIPE251 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active251.6 ft. AMH - Downstream Manhole, Survey Ends - 1:45AM

Observation photos (2)

  • General Observation - FR POLY LINE

    8 ft. - General Observation - FR POLY LINE

  • General Observation - WHITE BUILDUP ON PIPE

    8.1 ft. - General Observation - WHITE BUILDUP ON PIPE

Observations (9)

DistanceCodeObservation
8MGOFR POLY LINE
0MGOConn. @ Mh, 9 O' Clock. Active
0MWL
8.1MGOWHITE BUILDUP ON PIPE
251.6AMH1:45AM
0AMH1:25AM
0MGOConn. @ Mh, 3 O' Clock. Active
251MGOConn. @ Mh, 3 O' Clock. Active
0MWM

Properties (5)

custom_field_three
LINER GOOD COND.
custom_field_two
4
customer
LACSD
datetime
2017-07-26T01:10:24-07:00
lining
FR POLY