Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 24, 2018, 06:25 AM
  • 14 0468_14 0467 _23012018_230055.mp4

Date
01/23/2018
W/O
685065
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00580
PipeID
P18557
Time
10:25 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5384
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
WO_685065_TV14023_FEB2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0468
Downstream MH
14 0467
Dir. of Survey
Downstream
Length Surveyed
341.2 ft.
Total Length
341.2 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
340
O&M Index
2
O&M Quick
412M
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
480
Pipe schematic from manhole 14 0468 to 14 0467
MH: 14 0468MH: 14 0467downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04680 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"59.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"88.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"112.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"190 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"263.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"324.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"339.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish339.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish339.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish341.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0467

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
190TFC
30.8TFC
88.2TFC
263.5TFC
2SSS
339.6SAP
137.3TFC
112.7TFC
339.6DAGS
339.6SSS
2DAGS
0MWM
59.3TFC
0AMH14 0468
324.2TFC
2SAP
341.2AMH14 0467
0MWL

Properties (4)

additional_info
SC346963
custom_field_two
2
customer
LACSD
datetime
2018-01-23T22:25:54-08:00