18 1041_18 1040_3242018_101222.mp4
0 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
5.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
67 ft. - Crack Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES
78.8 ft. - Crack Multiple, from 12 to 05 o'clock, within 8 inches of joint: YES
80 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Active
93.8 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES
125.7 ft. - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES
148.5 ft. - General Photograph
149.6 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open
184.2 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Active
209.8 ft. - Crack Spiral, from 12 to 05 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 49.5 | TF | Open |
| 209.8 | CS | — |
| 221 | CM | — |
| 148.5 | MGP | — |
| 67 | CS | — |
| 0 | MWM | — |
| 221 | SSS | — |
| 223 | MGO | ROACHES @ MH |
| 78.8 | CM | — |
| 125.7 | CS | — |
| 0 | SSS | — |
| 0 | AMH | 9:59 AM |
| 5.9 | CM | — |
| 126.9 | TF | Open |
| 223 | AMH | 10;36 AM |
| 0 | MWL | — |
| 93.8 | CS | — |
| 149.6 | TFD | Open |
| 184.2 | TFD | Active |
| 223 | MGO | Grease Throughout The Reach (5%) |
| 80 | TFD | Active |