Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 23, 2018, 06:14 PM
  • 05 129_05 128A_3232018_111717.mp4

Date
03/23/2018
W/O
0674047
Weather
Damp
Operator/Surveyor
FRANKLIN
Sewer ID
Z00431
PipeID
P26491
Time
11:14 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Jetting
Media Label
G7665
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHORNE
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Capital Improvement Program Assesment
Project
20180323DF_DISTRICT_5_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
05 128A
Downstream MH
05 129
Dir. of Survey
Upstream
Length Surveyed
90 ft.
Total Length
90 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 05 128A to 05 129
MH: 05 128AMH: 05 129upstream0 ft. AMH - Upstream Manhole, Survey Ends - 11:38 AM1 ft. MGO - General Observation - Conn. @ Mh, 6 O' Clock. Active3 ft. MGP - General Photograph3.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG3.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish17.9 ft. MGP - General Photograph40.5 ft. MGP - General Photograph73.6 ft. MGP - General Photograph86.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"88 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start88 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG88 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start88 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start90 ft. MWL - Water Level, 20 %of cross sectional area90 ft. AMH - Downstream Manhole, Survey Begins - 11:15 AM90 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (8)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"

    3.9 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"

  • General Photograph

    16.4 ft. - General Photograph

  • General Photograph

    49.5 ft. - General Photograph

  • General Photograph

    72.1 ft. - General Photograph

  • General Photograph

    87 ft. - General Photograph

Observations (18)

DistanceCodeObservation
2SAP
86.9SZ65% MAG
0MWL
0AMH11:15 AM
2SZ65% MAG
86.9SAP
72.1MGP
49.5MGP
16.4MGP
3.9TFA
87MGP
86.9SRV
89MGOConn. @ Mh, 6 O' Clock. Active
86.9SSS
0MWM
2SRV
2SSS
90AMH11:38 AM

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2018-03-23T11:14:32-07:00