Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2018, 09:04 AM
  • H 0868_H 0859_3292018_022644.mp4

Date
03/29/2018
W/O
0695659
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00938
PipeID
P20427
Time
2:04 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0794
Sewer Name
H JOINT OUTFALL H - UNIT 7B RELIEF
City
INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
20180329MDM_JOINT_OUTFALL_H_UNIT_7B_RELIEF
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
H 0868
Downstream MH
H 0859
Dir. of Survey
Downstream
Length Surveyed
55.8 ft.
Total Length
55.8 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole H 0868 to H 0859
MH: H 0868MH: H 0859downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. STUB0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:15AM0 ft. MWM - Water Mark, 20 %of cross sectional area8 ft. MGO - General Observation - 18" VCP17.4 ft. MGO - General Observation - 18" VCP47.2 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - HAIRLINE52.7 ft. MGO - General Observation - THIN WHITE COATING OR BUILD-UP ON PIPE THROUGHOUT REACH55.8 ft. AMH - Downstream Manhole, Survey Ends - 2:25AM

Observation photos (3)

  • General Observation - 18" VCP

    8 ft. - General Observation - 18" VCP

  • General Observation - 18" VCP

    17.4 ft. - General Observation - 18" VCP

  • General Observation - THIN WHITE COATING OR BUILD-UP ON PIPE THROUGHOUT REACH

    52.7 ft. - General Observation - THIN WHITE COATING OR BUILD-UP ON PIPE THROUGHOUT REACH

Observations (9)

DistanceCodeObservation
52.7MGOTHIN WHITE COATING OR BUILD-UP ON PIPE THROUGHOUT REACH
0MGOConn. @ Mh, 3 O' Clock. STUB
55.8AMH2:25AM
17.4MGO18" VCP
0MWL
0AMH2:15AM
0MWM
47.2FCHAIRLINE
8MGO18" VCP

Properties (4)

custom_field_three
1 HAIRLINE
custom_field_two
4
customer
LACSD
datetime
2018-03-29T02:04:21-07:00