2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - FLAKING CONCRETE
2 ft. - General Observation - MAG COAT 30% START 8:00 TO 4:00
8 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG SPORATIC
8 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SLIGHT AGG UNDER MAG COAT
19 ft. - General Observation - MAG COAT 80% START
24.4 ft. - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - MODERATE AGG SPORATIC
42.7 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
69.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG SPORATIC
108.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
225.5 ft. - General Observation - MAG COAT 70% START
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | FLAKING CONCRETE |
| 328.1 | SAV | SEVERE AGG SPORATIC |
| 328.1 | MGO | MAG COAT 70% FINISH |
| 2 | MGO | MAG COAT 30% START 8:00 TO 4:00 |
| 7 | TFC | Capped |
| 8 | SAV | MODERATE AGG SPORATIC |
| 69.3 | SAV | MODERATE AGG SPORATIC |
| 328.1 | SAV | MADERATE AGG SPORATIC |
| 0 | AMH | 2:10AM |
| 19 | MGO | MAG COAT 80% START |
| 328.6 | AMH | 2:40AM |
| 319.9 | TF | Open |
| 225.5 | MGO | MAG COAT 70% START |
| 42.7 | SAV | SLIGHT AGG |
| 42.7 | SAV | SLIGHT AGG |
| 42.7 | SAV | SEVERE AGG SPORATIC |
| 90.9 | TF | Open |
| 8 | SAV | SLIGHT AGG UNDER MAG COAT |
| 0 | MWL | — |
| 0 | MWM | — |
| 24.4 | SAV | MODERATE AGG SPORATIC |
| 69.3 | SAV | MODERATE AGG SPORATIC |
| 328.1 | SSS | FLAKING CONCRETE |
| 69.3 | SAV | — |
| 108.3 | SAV | SEVERE AGG SPORATIC |