Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 22, 2018, 08:32 AM
  • 03 0240_03 0239_3222018_015128.mp4

Date
03/22/2018
W/O
0696856
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00385
PipeID
P04842
Time
1:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0786
Sewer Name
03 MARKET STREET TRUNK
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
07
Purpose
Routine Assessment
Project
20180322MDM_MARKET_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
25.899999618530273 in.
Upstream MH
03 0240
Downstream MH
03 0239
Dir. of Survey
Downstream
Length Surveyed
233.9 ft.
Total Length
233.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
5131
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 03 0240 to 03 0239
MH: 03 0240MH: 03 0239downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:55AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 20 %of cross sectional area8 ft. MGO - General Observation - 25.90" VCP-CIPP44.8 ft. MWL - Water Level, 40 %of cross sectional area44.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start44.8 ft. MWM - Water Mark, 80 %of cross sectional area44.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE54.6 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Start54.6 ft. MWL - Water Level, 60 %of cross sectional area64.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish94.6 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Finish94.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE114.2 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active233.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active233.5 ft. MGO - General Observation - Conn. @ Mh, 9:30' Clock. Active233.9 ft. AMH - Downstream Manhole, Survey Ends - 2:20AM

Observation photos (2)

  • General Observation - 25.90" VCP-CIPP

    8 ft. - General Observation - 25.90" VCP-CIPP

  • Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    44.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
233.5MGOConn. @ Mh, 9 O' Clock. Active
114.2TBActive
0AMH1:55AM
44.8MWL
0MWL
94.6MWLS
94.6DSZSLUDGE
44.8DAGS
8MGO25.90" VCP-CIPP
0MGOConn. @ Mh, 9 O' Clock. Active
54.6MWLS
44.8MWM
54.6MWL
64.6DAGS
233.5MGOConn. @ Mh, 9:30' Clock. Active
0MGOConn. @ Mh, 3 O' Clock. Active
0MWM
233.9AMH2:20AM
44.8DSZSLUDGE

Properties (5)

custom_field_three
CIPP LINER GOOD COND. --50% SAG IN LINE
custom_field_two
4
customer
LACSD
datetime
2018-03-22T01:32:09-07:00
lining
CIPP