Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 3, 2015, 11:25 AM
  • 20 0256_20 0255_03112015_032550.mp4

Date
11/03/2015
W/O
531056
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19223
Time
3:25 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2820
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
WO_531056_TV20009_OCT2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
20 0256
Downstream MH
20 0255
Dir. of Survey
Downstream
Length Surveyed
287.1 ft.
Total Length
287.1 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
171
O&M Index
2
O&M Quick
412K
O&M Rating
120
Overall Index
3
Overall Quick
Overall Rating
291
Pipe schematic from manhole 20 0256 to 20 0255
MH: 20 0256MH: 20 0255downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 20 02560 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COATING 60%25.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES49.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"198.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"246.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"285.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish287.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0255

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
285.3SAP
49.1TFC
285.3DAGS
2.3SAP
287.1AMH20 0255
246.5TFC
0MWL
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
198.3TFC
0AMH20 0256
0MWM
25.1DAGS
150TFC
2.3MGOMAG COATING 60%
97.5TFC
2DAGS

Properties (4)

additional_info
SC204154
custom_field_two
3
customer
LACSD
datetime
2015-11-03T03:25:28-08:00