Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2018, 05:52 AM
  • H 0292_H 0291 _03142018_225433.mp4

Date
03/14/2018
W/O
694838
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00174
PipeID
P10747
Time
10:52 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5486
Sewer Name
H JOINT OUTFALL H - UNIT 3
City
PICO RIVERA
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
24
Purpose
Routine Assessment
Project
WO_694838_DISTRICT02_MAR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0291
Downstream MH
H 0292
Dir. of Survey
Upstream
Length Surveyed
485.5 ft.
Total Length
485.5 ft.
Structural Index
4
Structural Quick
5M3R
Structural Rating
636
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
636
Pipe schematic from manhole H 0291 to H 0292
MH: H 0291MH: H 0292upstream0 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish0 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - H 029210 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"62.2 ft. MGP - General Photograph - OF REINFORCEMENT345.6 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start435.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"446.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"483.5 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start485.5 ft. MWL - Water Level, 10 %of cross sectional area485.5 ft. AMH - Downstream Manhole, Survey Begins - H 0291

Observation photos (3)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    139.9 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - OF REINFORCEMENT

    423.3 ft. - General Photograph - OF REINFORCEMENT

Observations (11)

DistanceCodeObservation
485.5SAP
139.9SRV
50.1TBA
485.5SRV
485.5AMHH 0292
0MWL
39TFC
475.5TFC
0AMHH 0291
2SAP
423.3MGPOF REINFORCEMENT

Properties (4)

additional_info
SC358493
custom_field_two
2
customer
LACSD
datetime
2018-03-14T22:52:48-07:00