Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2018, 10:40 AM
  • 21 1090_21 1089 _26022018_025304.mp4

Date
02/26/2018
W/O
690352
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00784
PipeID
P16150
Time
2:40 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5437
Sewer Name
21 SAN ANTONIO TRUNK
City
CLAREMONT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
03
Purpose
Routine Assessment
Project
WO_690352_TV21055_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
21 1089
Downstream MH
21 1090
Dir. of Survey
Upstream
Length Surveyed
280.1 ft.
Total Length
280.1 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
168
O&M Index
2
O&M Quick
3113
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
174
Pipe schematic from manhole 21 1089 to 21 1090
MH: 21 1089MH: 21 1090upstream0 ft. AMH - Upstream Manhole, Survey Ends - 21 10900.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.2 ft. MGO - General Observation - CAPPED LATERAL 12 O'CLOCK @ MH0.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK19.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100 ft. RML - Roots Medium Lateral, at 10 o'clock, 30 %, within 8 inches of joint: NO100 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"128.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"128.8 ft. RFL - Roots Fine Lateral, at 02 o'clock128.8 ft. RFC - Roots Fine Connection, at 02 o'clock201.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"246.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"246.2 ft. RFC - Roots Fine Connection, at 02 o'clock278 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start280.1 ft. MWM - Water Mark, 25 %of cross sectional area280.1 ft. MWL - Water Level, 10 %of cross sectional area280.1 ft. AMH - Downstream Manhole, Survey Begins - 21 1089280.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
279.9SAP
180.1RML
0MWM
33.9TF
151.3TF
151.3RFL
180.1TF
0MWL
0AMH21 1089
280.1AMH21 1090
151.3RFC
279.9MGOCAPPED LATERAL 12 O'CLOCK @ MH
2.1SAP
78.3TF
74.8TFC
260.9TFC
33.9RFC
0MGOCONNECTION AT MH 3 O'CLOCK
279.9MGOCONNECTION AT MH 3 O'CLOCK

Properties (4)

additional_info
SC347092
custom_field_two
2
customer
LACSD
datetime
2018-02-26T02:40:50-08:00