08 0255_08 0254 _08122016_024516.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
15.1 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES
93.4 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
113.1 ft. - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES
121.7 ft. - Infiltration Dripper, at 11 o'clock, within 8 inches of joint: YES
289 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 289 | CM | — |
| 2 | DAGS | — |
| 0 | AMH | 08 0255 |
| 15.1 | CM | — |
| 331.3 | AMH | 08 0254 |
| 113.1 | ID | — |
| 0 | MWM | — |
| 331.3 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 93.4 | ID | — |
| 329.4 | DAE | — |
| 329.4 | DAGS | — |
| 2 | DAE | — |
| 121.7 | ID | — |
| 0 | MWL | — |