Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2016, 10:28 AM
  • 08 0259A_08 0259 _08102016_034508.mp4

Date
08/10/2016
W/O
580478
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00004
PipeID
P00301
Time
3:28 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3631
Sewer Name
08 DEL AMO TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
08
Purpose
Routine Assessment
Project
WO_580478_TV08039_JULY2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
08 0259
Downstream MH
08 0259A
Dir. of Survey
Upstream
Length Surveyed
280.9 ft.
Total Length
280.9 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
120
Pipe schematic from manhole 08 0259 to 08 0259A
MH: 08 0259MH: 08 0259Aupstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 08 0259A2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: YES58.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"60.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"67.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES160.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"164.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"264.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"267.1 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES267.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"278.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start280.9 ft. MWL - Water Level, 20 %of cross sectional area280.9 ft. MWM - Water Mark, 40 %of cross sectional area280.9 ft. AMH - Downstream Manhole, Survey Begins - 08 0259

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

    13.8 ft. - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    213.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    275.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 05 o'clock,  , within 8 inches of joint: YES

    275.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
120TFC
220TFC
213.4CM
13.8CM
280.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
16.4TFC
2DAGS
0MWL
116.8TFC
0MWM
280.9AMH08 0259A
222.8TFC
275.9CL
275.9DAE
13.6TFC
278.4DAGS
0AMH08 0259

Properties (4)

additional_info
SC306065
custom_field_two
4
customer
LACSD
datetime
2016-08-10T03:28:46-07:00