Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 28, 2016, 06:07 AM
  • A 0771A_A 0771_20160428_001925.mp4

Date
04/27/2016
W/O
547077
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00314
PipeID
P07676
Time
11:07 PM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3193
Sewer Name
A JOA-1A CHINO BASIN WASTEWATER LINE
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
21
Purpose
Routine Assessment
Project
WO_547077_TV21024_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
A 0771A
Downstream MH
A 0771
Dir. of Survey
Downstream
Length Surveyed
316.3 ft.
Total Length
316.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole A 0771A to A 0771
MH: A 0771AMH: A 0771downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 0771A2 ft. MGO - General Observation - MAG.H.C. 40% START312.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"316.3 ft. MGO - General Observation - MAG.H.C. 40% FINISH316.3 ft. AMH - Downstream Manhole, Survey Ends - A 0771

Observations (8)

DistanceCodeObservation
312.2TF
0MGOCONNECTION AT THE MH 3 OC'LOCK
2MGOMAG.H.C. 40% START
0MWL
316.3MGOMAG.H.C. 40% FINISH
0MWM
316.3AMHA 0771
0AMHA 0771A

Properties (4)

additional_info
SC226241
custom_field_two
4
customer
LACSD
datetime
2016-04-27T23:07:16-07:00