Section#4_H 0350_H 0349__3142018__G6972.mp4
2 ft. - General Observation - 80% MAG COAT 9:00 TO 3:00 START
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
8 ft. - General Observation - MAG COAT 80%
38.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
69.3 ft. - General Observation - MAG COAT 20%
69.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
162.6 ft. - General Observation - 63" RCP
192.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
203.1 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVER AGG
539.1 ft. - General Observation - MAG COAT 20% START
587 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
841.6 ft. - General Observation - 80% MAG START
| Distance | Code | Observation |
|---|---|---|
| 266.1 | MGO | MAG COAT FINISH |
| 0 | MWM | 20% NORMAL |
| 872 | MGO | MAG COAT 80% FINISH |
| 69.3 | MGO | MAG COAT 20% |
| 192.7 | SSS | BLISTERING CONCRETE |
| 8 | MGO | MAG COAT 80% |
| 162.6 | MGO | 63" RCP |
| 2 | MGO | 80% MAG COAT 9:00 TO 3:00 START |
| 38.2 | SSS | BLISTERING CONCRETE |
| 872 | DAGS | — |
| 0 | AMH | 2:50AM |
| 841.6 | MGO | 80% MAG START |
| 0 | MWL | — |
| 2 | DAGS | — |
| 539.1 | MGO | MAG COAT 20% START |
| 69.3 | SSS | BLISTERING CONCRETE |
| 203.1 | SAV | SEVER AGG |
| 872.4 | AMH | 3:50AM |
| 587 | SSS | BLISTERING CONCRETE |
| 2 | SSS | BLISTERING CONCRETE |
| 872 | SSS | BLISTERING CONCRETE |