C 0313_C 0312A_3102018_045025.mp4
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR
17.1 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - CIRCUM
36 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: NO - LONG CIRCUM
94.5 ft. - Surface Reinforcement Corroded, from 01 to 03 o'clock, within 8 inches of joint: NO - CIRCUM
166.9 ft. - Surface Reinforcement Visible, from 10 to 12 o'clock, within 8 inches of joint: YES - LONG CIRCUM
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 2 | SRC | LONG CIRCUM REBAR |
| 0 | MWM | — |
| 166.9 | SRV | LONG CIRCUM |
| 8 | SRC | LONG CIRCUM REBAR |
| 159.7 | SRV | LNG |
| 204.4 | SAP | SEVRER AGG |
| 0 | AMH | 4:50AM |
| 25.1 | SRV | CIRCUM |
| 204.4 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SAP | SEVERE AGG |
| 36 | SRV | LONG CIRCUM |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 17.1 | SRV | CIRCUM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 204.9 | AMH | 5:15AM |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 94.5 | SRC | CIRCUM |