Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 9, 2018, 09:19 AM
  • 03 0432_03 0431_392018_022346.mp4

Date
03/09/2018
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00406
PipeID
P04980
Time
1:19 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0770
Sewer Name
03 WATER STREET TRUNK
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20180309MDM_WATER_STREET_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
03 0432
Downstream MH
03 0431
Dir. of Survey
Downstream
Length Surveyed
158.6 ft.
Total Length
158.6 ft.
Structural Index
3
Structural Quick
4135
Structural Rating
21
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
21
Pipe schematic from manhole 03 0432 to 03 0431
MH: 03 0432MH: 03 0431downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. MGO - General Observation - MAG COAT 95% START 8:00 TO 4:002 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UMDER MAG COAT8.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE19 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG19 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG22.6 ft. SAV - Surface Aggregate Visible, from 01 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG35.7 ft. MGO - General Observation - 80% MAG COAT START37 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG73.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AAGG108.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG108.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG108.4 ft. MGO - General Observation - MAG COAT 20% START137.9 ft. MGO - General Observation - MAG COAT 90% START158.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE158.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG158.1 ft. MGO - General Observation - MAG COAT 90% FINISH158.6 ft. AMH - Downstream Manhole, Survey Ends - 2:50AM

Observation photos (10)

  • General Observation - MAG COAT 95% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 95% START 8:00 TO 4:00

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UMDER MAG COAT

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UMDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    8.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    19 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 01 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    22.6 ft. - Surface Aggregate Visible, from 01 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - 80% MAG COAT START

    35.7 ft. - General Observation - 80% MAG COAT START

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    37 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AAGG

    73.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AAGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    108.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - MAG COAT 90% START

    137.9 ft. - General Observation - MAG COAT 90% START

Observations (21)

DistanceCodeObservation
2MGOMAG COAT 95% START 8:00 TO 4:00
35.7MGO80% MAG COAT START
73.3SAPSEVERE AAGG
158.1SSSPEELING CONCRETE
108.4SAPSEVERE AGG
108.4SAVSEVERE AGG
158.1SAPSEVERE AGG
0MWL
108.4MGOMAG COAT 20% START
22.6SAVSEVERE AGG
158.6AMH2:50AM
37SAPSEVERE AGG
0AMH2:20AM
137.9MGOMAG COAT 90% START
8.5SSSPEELING CONCRETE
19SAMSEVERE AGG
158.1MGOMAG COAT 90% FINISH
2SAMSEVERE AGG UMDER MAG COAT
19SAVSEVERE AGG
0MWM
0MGOConn. @ Mh, 3 O' Clock. Active

Properties (4)

custom_field_three
MISSING & PROJECTING SEVERE AGG - 90% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2018-03-09T01:19:47-08:00