05 1070_05 1298_362018_031336.mp4
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE-LAITANCE COAT
13.9 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
20.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, - SEVERE AGG SPORATIC
32.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
119 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
125.1 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE PEELING CONCRETE PIPE
136.5 ft. - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
151.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
172.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
413 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
444.8 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
492.7 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
541.4 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
| Distance | Code | Observation |
|---|---|---|
| 151.4 | SSS | PEELING CONCRETE |
| 32.9 | SSS | PEELING CONCRETE |
| 181.5 | SAV | SEVERE AGG SPORATIC |
| 172.2 | SSS | PEELING CONCRETE |
| 413 | SSS | PEELING CONCRETE |
| 587.5 | SAV | SEVERE AGG VERY SPORATIC |
| 2 | SSS | PEELING BLISTERING CONCRETE |
| 587.5 | SSS | PEELING CONCRETE LAITANCE COAT |
| 0 | MWL | — |
| 587.5 | SAV | SLUDGE- PELLED CONCRETE |
| 119 | SAV | SEVERE AGG SPORATIC |
| 2 | SSS | PEELING CONCRETE-LAITANCE COAT |
| 587.5 | SSS | PEELING BLISTERING CONCRETE |
| 13.9 | SAV | SEVERE AGG SPORATIC |
| 492.7 | SAV | SEVERE AGG SPORATIC |
| 136.5 | SAV | SEVERE AGG SPORATIC |
| 20.8 | SAV | SEVERE AGG SPORATIC |
| 444.8 | SAV | SEVERE AGG SPORATIC |
| 587.9 | AMH | 4:05AM |
| 587.5 | MGO | Conn. @ Mh, 4 O' Clock. Active |
| 125.1 | DSZ | SLUDGE PEELING CONCRETE PIPE |
| 0 | AMH | 3:10AM |
| 541.4 | SAV | SEVERE AGG SPORATIC |
| 587.5 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 0 | MWM | — |