- Date
- 03/01/2018
- W/O
- PEDNING
- Weather
- Dry
- Operator/Surveyor
- SANTIAGO OBREGON
- Sewer ID
- Z00870
- PipeID
- P21537
- Time
- 1:11 PM
- Certificate
- U-1014-06022541
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G7641
- Sewer Name
- 30 LUNADA BAY P.P. INFLUENT SEWER
- City
- PV
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 30
- Page No.
- 10
- Purpose
- Routine Assessment
- Project
- 20180301SHO_LUNADA_BAY_PP_INFLUENT_SEWER
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 12 in.
- Upstream MH
- 30 0291
- Downstream MH
- 30 0357
- Dir. of Survey
- Downstream
- Length Surveyed
- 33.3 ft.
- Total Length
- 33.3 ft.
- Structural Index
- 0
- Structural Quick
- 0000
- Structural Rating
- 0
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 2
Pipe schematic from manhole 30 0291 to 30 0357 Observation photos (1)

8.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start