Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 13, 2018, 08:02 AM
  • 05 1600_05 1599 _13022018_002328.mp4

Date
02/13/2018
W/O
679239
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00485
PipeID
P06824
Time
12:02 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5403
Sewer Name
05 MARICOPA STREET TRUNK
City
TORRANC
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
25
Purpose
Routine Assessment
Project
WO_679239_TV05070_JAN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 1600
Downstream MH
05 1599
Dir. of Survey
Downstream
Length Surveyed
312.2 ft.
Total Length
312.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
302
O&M Index
2
O&M Quick
5112
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
309
Pipe schematic from manhole 05 1600 to 05 1599
MH: 05 1600MH: 05 1599downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 16000 ft. MGO - General Observation - ACTIVE CONNECTIONS AT MH 3 AND 9 O'CLOCK0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 75 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.8 ft. MWL - Water Level, 10 %of cross sectional area27.8 ft. MWM - Water Mark, 20 %of cross sectional area119.8 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"168.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"171.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"227.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"275.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"279.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"282.1 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start294.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish310.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish310.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish312.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1599

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    21.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    282.1 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

Observations (20)

DistanceCodeObservation
231.7TFC
0AMH05 1600
279.7TFC
27.8MWL
310.3SAP
0MGOACTIVE CONNECTIONS AT MH 3 AND 9 O'CLOCK
119.8TBA
294.3RFJ
0MWL
0MWM
275.7TFA
227.7TFC
171.8TFA
282.1RFJ
21.2SSS
312.2AMH05 1599
27.8MWM
168.1TFC
310.3SSS
2SAP

Properties (4)

additional_info
SC346987
custom_field_two
2
customer
LACSD
datetime
2018-02-13T00:02:59-08:00