Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2018, 09:17 AM
  • 08 0000_08 0646_2262018_020107.mp4

Date
02/26/2018
W/O
0685105
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00561
PipeID
P21470
Time
1:17 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0753
Sewer Name
08 MAIN STREET P.P. INFLUENT SEWER
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
20180226MDM_MAIN_STREET_P_P_INFLUENT_SEWER
Material
CIP
Shape
Circular
Height
30 in.
Upstream MH
08 0000
Downstream MH
08 0646
Dir. of Survey
Downstream
Length Surveyed
41.8 ft.
Total Length
41.8 ft.
Structural Index
3
Structural Quick
3521
Structural Rating
17
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole 08 0000 to 08 0646
MH: 08 0000MH: 08 0646downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:50AM0 ft. MWL - Water Level, 80 %of cross sectional area0 ft. MWM - Water Mark, 80 %of cross sectional area2 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 30% MISSING PIPE2 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 30% MISSING PIPE4.3 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING METAL PIPE19.1 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES - 30% MISSING PIPE26.4 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES - 30% MISSING PIPE29.8 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 30% MISSING PIPE41.2 ft. SCP - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - 30% MISSING PIPE41.8 ft. AMH - Downstream Manhole, Survey Begins - 2:20AM

Observation photos (6)

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 30% MISSING PIPE

    2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 30% MISSING PIPE

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 30% MISSING PIPE

    2 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - 30% MISSING PIPE

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING METAL PIPE

    4.3 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING METAL PIPE

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES - 30% MISSING PIPE

    19.1 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES - 30% MISSING PIPE

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES - 30% MISSING PIPE

    26.4 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: YES - 30% MISSING PIPE

  • Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 30% MISSING PIPE

    29.8 ft. - Surface Corrosion Metal Pipe, from 10 to 02 o'clock, within 8 inches of joint: NO - 30% MISSING PIPE

Observations (11)

DistanceCodeObservation
26.4SCP30% MISSING PIPE
41.8AMH2:20AM
29.8SCP30% MISSING PIPE
0AMH1:50AM
0MWL
2SCP30% MISSING PIPE
0MWM
4.3SSSPEELING METAL PIPE
41.2SCP30% MISSING PIPE
19.1SCP30% MISSING PIPE
2SCP30% MISSING PIPE

Properties (4)

custom_field_three
30% MISSING PIPE
custom_field_two
2
customer
LACSD
datetime
2018-02-26T01:17:46-08:00