21 0943_21 0942_05022018_231928.mp4
3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
136.3 ft. - Material Change, Vitrified clay pipe
144.3 ft. - Material Change, Concrete pipe (non-reinfored)
144.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
151.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
187.8 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 1"
203.3 ft. - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES
251.7 ft. - General Observation - SPOT REPAIR VCP
398.4 ft. - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 525.5 | AMH | 21 0942 |
| 144.3 | MMC | — |
| 136.3 | SAP | — |
| 0 | MWM | — |
| 136.3 | MMC | — |
| 144.3 | SAP | — |
| 0 | MWL | — |
| 312.3 | TBA | — |
| 398.4 | CL | — |
| 0 | AMH | 21 0943 |
| 462.1 | TBA | — |
| 3.3 | SAP | — |
| 203.3 | FL | — |
| 257.4 | TBA | — |
| 251.7 | MGO | SPOT REPAIR VCP |
| 357.1 | TBA | — |
| 400.2 | TBA | — |
| 151.6 | FM | — |
| 3.3 | MGO | MAG COAT START |
| 187.8 | TBI | — |
| 522.7 | SAP | — |