Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2018, 10:46 AM
  • 05 2315_05 0665 _04012018_030158.mp4

Date
01/04/2018
W/O
679249
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00520
PipeID
P05891
Time
2:46 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5306
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_679249_TV05103_JAN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
05 2315
Downstream MH
05 0665
Dir. of Survey
Downstream
Length Surveyed
356.3 ft.
Total Length
356.3 ft.
Structural Index
2
Structural Quick
3121
Structural Rating
6
O&M Index
2
O&M Quick
2M11
O&M Rating
141
Overall Index
2
Overall Quick
Overall Rating
147
Pipe schematic from manhole 05 2315 to 05 0665
MH: 05 2315MH: 05 0665downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 23150 ft. VC - Vermin Cockroach2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start54.3 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"60 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"98.7 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"131 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"212.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"224.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES257.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"312.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"316.7 ft. CC - Crack Circumferential, from 04 to 09 o'clock, within 8 inches of joint: YES332.9 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES353.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish356.3 ft. AMH - Downstream Manhole, Survey Ends - 05 0665

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    224.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 04 to 09 o'clock, within 8 inches of joint: YES

    316.7 ft. - Crack Circumferential, from 04 to 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    332.9 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
0MWL
356.3AMH05 0665
131TFA
2.3DAGS
54.3TBA
60TFA
312.9TFC
212.1TFC
332.9CL
353.4DAGS
0MWM
0AMH05 2315
98.7TBA
224.8FL
257.1TFA
316.7CC
0VC

Properties (4)

additional_info
SC346475
custom_field_two
4
customer
LACSD
datetime
2018-01-04T02:46:08-08:00