Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2018, 08:34 AM
  • 05 0656_05 0655 _05012018_011640.mp4

Date
01/05/2018
W/O
679249
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00520
PipeID
P05881
Time
12:34 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5307
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_679249_TV05103_JAN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
05 0656
Downstream MH
05 0655
Dir. of Survey
Downstream
Length Surveyed
349.8 ft.
Total Length
349.8 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 0656 to 05 0655
MH: 05 0656MH: 05 0655downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 05 06562.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start30.3 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES118.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"169.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"223.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"270.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"317.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"349.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish349.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ACTIVE349.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED349.8 ft. AMH - Downstream Manhole, Survey Ends - 05 0655

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    30.3 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
349.7MGOCONNECTION AT MH 3 O'CLOCK ACTIVE
30.3CL
349.8AMH05 0655
270.9TFC
2.5DAGS
0MGOCONNECTION AT MH 9 O'CLOCK CAPPED
223.5TFA
0MWM
0MWL
169.8TFA
349.7MGOCONNECTION AT MH 9 O'CLOCK CAPPED
349.2DAGS
0VC
0MGOCONNECTION AT MH 3 O'CLOCK ACTIVE
317.3TFC
0AMH05 0656
118.2TFA

Properties (4)

additional_info
SC346901
custom_field_two
4
customer
LACSD
datetime
2018-01-05T00:34:55-08:00