Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2016, 09:01 AM
  • A 0372_A 0371_14062016_020207.mp4

Date
06/14/2016
W/O
574386
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08282
Time
2:01 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3529
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_574386_TV15185_JUNE2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
A 0372
Downstream MH
A 0371
Dir. of Survey
Downstream
Length Surveyed
488.5 ft.
Total Length
488.5 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
208
O&M Index
2
O&M Quick
2R00
O&M Rating
194
Overall Index
2
Overall Quick
Overall Rating
402
Pipe schematic from manhole A 0372 to A 0371
MH: A 0372MH: A 0371downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 03720 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start30.3 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES35.3 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start35.3 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start240.2 ft. MMC - Material Change, Vitrified clay pipe240.2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish240.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish486.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish488.5 ft. AMH - Downstream Manhole, Survey Ends - A 0371

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES

    30.3 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    35.3 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    35.3 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    240.2 ft. - Material Change, Vitrified clay pipe

Observations (12)

DistanceCodeObservation
488.5AMHA 0371
0AMHA 0372
2DAGS
35.3SAP
0MWM
240.2MMC
240.2SAP
0MWL
240.2SSS
35.3SSS
30.3SAP
486.3DAGS

Properties (5)

additional_info
SC305762
custom_field_two
3
customer
LACSD
datetime
2016-06-14T02:01:40-07:00
year_laid
29462