Wastewater/Activity/PacpInspection/1.0Jun 16, 2016, 09:09 AM
  • A 0325_A 0324 _16062016_024413.mp4

Date
06/16/2016
W/O
574385
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08235
Time
2:09 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3533
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
SOUTH EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
22
Purpose
Routine Assessment
Project
WO_574385_TV15129_JUNE2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
60 in.
Upstream MH
A 0325
Downstream MH
A 0324
Dir. of Survey
Downstream
Length Surveyed
742.2 ft.
Total Length
742.2 ft.
Structural Index
3
Structural Quick
3]2]
Structural Rating
740
O&M Index
2
O&M Quick
412]
O&M Rating
300
Overall Index
2
Overall Quick
Overall Rating
1040
Pipe schematic from manhole A 0325 to A 0324
MH: A 0325MH: A 0324downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 03250.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start0.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start0.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start47 ft. MGO - General Observation - MAG COATING 70%741 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish741 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish741 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish742.2 ft. AMH - Downstream Manhole, Survey Ends - A 0324

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    0.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    0.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    0.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWM
742.2AMHA 0324
0.1SAP
0MWL
0AMHA 0325
0.1SSS
0.1DAGS
741SSS
47MGOMAG COATING 70%
741DAGS
741SAP

Properties (5)

additional_info
SC305766
custom_field_two
3
customer
LACSD
datetime
2016-06-16T02:09:59-07:00
year_laid
29314