Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2016, 08:00 AM
  • A 0323_A 0322 _16062016_012451.mp4

Date
06/16/2016
W/O
574385
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08233
Time
1:00 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3533
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
SOUTH EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_574385_TV15129_JUNE2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
60 in.
Upstream MH
A 0323
Downstream MH
A 0322
Dir. of Survey
Downstream
Length Surveyed
620.9 ft.
Total Length
620.9 ft.
Structural Index
3
Structural Quick
3X2X
Structural Rating
620
O&M Index
2
O&M Quick
412X
O&M Rating
252
Overall Index
2
Overall Quick
Overall Rating
872
Pipe schematic from manhole A 0323 to A 0322
MH: A 0323MH: A 0322downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - A 03230.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start80.2 ft. MGO - General Observation - MAG COATING 50%620.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish620.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish620.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish620.9 ft. AMH - Downstream Manhole, Survey Ends - A 0322

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    0.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
620.9DAGS
80.2MGOMAG COATING 50%
620.9AMHA 0322
0MWM
620.8SAP
0MWL
0DAGS
0.1SAP
2SSS
620.8SSS
0AMHA 0323

Properties (5)

additional_info
SC305766
custom_field_two
3
customer
LACSD
datetime
2016-06-16T01:00:58-07:00
year_laid
29314