Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 16, 2016, 10:43 AM
  • A 0305_A 0304 _16062016_042004.mp4

Date
06/16/2016
W/O
574385
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08215
Time
3:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3533
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Routine Assessment
Project
WO_574385_TV15129_JUNE2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
A 0305
Downstream MH
A 0304
Dir. of Survey
Downstream
Length Surveyed
1064.2 ft.
Total Length
1064.2 ft.
Structural Index
3
Structural Quick
513i
Structural Rating
1065
O&M Index
2
O&M Quick
412i
O&M Rating
428
Overall Index
2
Overall Quick
Overall Rating
1493
Pipe schematic from manhole A 0305 to A 0304
MH: A 0305MH: A 0304downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 03050 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start1064.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1064.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES1064.2 ft. AMH - Downstream Manhole, Survey Ends - A 03041064.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1064.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Finish

    1064.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observations (11)

DistanceCodeObservation
2SAP
0AMHA 0305
1064.2SAP
0MWL
1064.2SRV
1064.2AMHA 0304
0MWM
1064.2SSS
1064.2DAGS
2SSS
2DAGS

Properties (5)

additional_info
SC305766
custom_field_two
2
customer
LACSD
datetime
2016-06-16T03:43:02-07:00
year_laid
28972