Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 9, 2016, 09:05 AM
  • B 0408_B 0407 _09062016_020605.mp4

Date
06/09/2016
W/O
574278
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00092
PipeID
P08920
Time
2:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3523
Sewer Name
B JOINT OUTFALL B - UNIT 5B
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
WO_574278_TV15053_JUNE2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0408
Downstream MH
B 0407
Dir. of Survey
Downstream
Length Surveyed
244.1 ft.
Total Length
244.1 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
240
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
336
Pipe schematic from manhole B 0408 to B 0407
MH: B 0408MH: B 0407downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 04080 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start93.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"106 ft. MGO - General Observation - MAG COATING 60%158 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish242.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish242.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish244.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK244.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE244.1 ft. AMH - Downstream Manhole, Survey Ends - B 0407

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWM
101.3TF
158TF
0AMHB 0408
244.1MGOACTIVE CONNECTION AT MH 3 O'CLOCK
221.7TFC
242.7DAGS
2DAGS
244.1MGOCOCKROACHES IN MANHOLE
0MWL
2SSS
242.7SSS
93.8TF
244.1AMHB 0407
2SAV
106MGOMAG COATING 60%
242.6SAV
0MGOCOCKROACHES IN MANHOLE

Properties (4)

additional_info
SC305754
custom_field_two
2
customer
LACSD
datetime
2016-06-09T02:05:29-07:00