Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2016, 07:43 AM
  • 15 0723_15 0722_14062016_004348.mp4

Date
06/14/2016
W/O
574407
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00616
PipeID
P12616
Time
12:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3528
Sewer Name
15 MONROVIA OUTFALL TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
09
Purpose
Routine Assessment
Project
WO_574407_TV15131_JUNE2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
15 0723
Downstream MH
15 0722
Dir. of Survey
Downstream
Length Surveyed
55 ft.
Total Length
55 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
33
O&M Index
2
O&M Quick
2A00
O&M Rating
22
Overall Index
3
Overall Quick
Overall Rating
55
Pipe schematic from manhole 15 0723 to 15 0722
MH: 15 0723MH: 15 0722downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 07230 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COATING 60%17.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"55 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"55 ft. AMH - Downstream Manhole, Survey Ends - 15 072255 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"55 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"55 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish55 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    55 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"

    55 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6"

Observations (14)

DistanceCodeObservation
0AMH15 0723
0MWM
2.4SAP
2.4MGOMAG COATING 60%
0MGOCOCKROACHES IN MANHOLE
2DAGS
55TB
55AMH15 0722
55TB
0MWL
55TB
17.4TBA
55SAP
55DAGS

Properties (4)

additional_info
SC305761
custom_field_two
4
customer
LACSD
datetime
2016-06-14T00:43:32-07:00