- Date
- 02/17/2018
- W/O
- 0690350
- Weather
- Dry
- Operator/Surveyor
- REVELES
- Sewer ID
- Z00003
- PipeID
- P00410
- Time
- 4:58 AM
- Certificate
- U-115-06022630
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0744
- Sewer Name
- 08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
- City
- Carson
- Loc. details
- Alley
- Location Code
- H
- Use of Sewer
- Sanitary Sewer
- District
- District 08
- Page No.
- 12
- Purpose
- Capital Improvement Program Assesment
- Project
- 20180217VMR_DAVIDSON_CITY_TRUNK_SECTS_123
- Material
- NRCP
- Shape
- Circular
- Height
- 18 in.
- Upstream MH
- 08 0358A
- Downstream MH
- 08 0358
- Dir. of Survey
- Downstream
- Length Surveyed
- 131.8 ft.
- Total Length
- 131.8 ft.
- Structural Index
- 3
- Structural Quick
- 3200
- Structural Rating
- 6
- O&M Index
- 2
- O&M Quick
- 2200
- O&M Rating
- 4
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 10
Pipe schematic from manhole 08 0358A to 08 0358 Observation photos (2)

1.4 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES

112.5 ft. - Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: YES, 1", 1" - Capped