Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 16, 2018, 08:57 AM
  • 01 0427_01 0426_2162018_022451.mp4

Date
02/16/2018
W/O
0689084
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00208
PipeID
P00908
Time
12:57 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0740
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
WILLBROOK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20180216MDM_HOLMES_WILLOWBROOK_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
01 0427
Downstream MH
01 0426
Dir. of Survey
Downstream
Length Surveyed
305.7 ft.
Total Length
305.7 ft.
Structural Index
3
Structural Quick
4331
Structural Rating
21
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
23
Pipe schematic from manhole 01 0427 to 01 0426
MH: 01 0427MH: 01 0426downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 98% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTCHED17.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT27.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped33 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped34.5 ft. SAM - Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: NO - SVERE AGG51.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped55.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped58.5 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open76.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped80.3 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTCHED81.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped90.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - ROCK99.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped104.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped109.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open116.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped153.1 ft. MGO - General Observation - MAG COAT 85% START153.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped180.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped193.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE AEVERE AGG ATTCHED196 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped201.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped216.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open221.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped228.7 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG247.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped249.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish - SLIGHGT252.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped273.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped278.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped283.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped301.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped305.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTCHED305.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active305.2 ft. MGO - General Observation - MAG COAT 85% FINISH305.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG305.7 ft. AMH - Downstream Manhole, Survey Ends - 3:05AM

Observation photos (9)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 98% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 98% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTCHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTCHED

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    17.9 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: NO - SVERE AGG

    34.5 ft. - Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: NO - SVERE AGG

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTCHED

    80.3 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTCHED

  • General Observation - MAG COAT 85% START

    153.1 ft. - General Observation - MAG COAT 85% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE AEVERE AGG ATTCHED

    193.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE AEVERE AGG ATTCHED

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    228.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (43)

DistanceCodeObservation
17.9FLSLIGHT
99.1TFCCapped
58.5TBOpen
196TFCCapped
0AMH2:20AM
201.4TFCCapped
90.9DSZROCK
2SAMSEVERE AGG
305.2SSSPEELING CONCRETE SEVERE AGG ATTCHED
273.1TFCCapped
2MGOMAG COAT 98% START 8:00 TO 4:00
81.2TFCCapped
252.7TFCCapped
80.3SSSPEELING CONCRETE SEVERE AGG ATTCHED
27.9TFCCapped
283.2TFCCapped
247.4TFCCapped
51.1TFCCapped
109.1TFOpen
33TFCCapped
305.7AMH3:05AM
228.7SAMSEVERE AGG
216.6TFOpen
76.6TFCCapped
180.9TFCCapped
0MGOConn. @ Mh, 3 O' Clock. Active
305.2MGOConn. @ Mh, 3 O' Clock. Active
116.9TFCCapped
305.2MGOMAG COAT 85% FINISH
301.3TFCCapped
193.6SSSPEELING CONCRETE AEVERE AGG ATTCHED
278.2TFCCapped
0MWM
221.9TFCCapped
153.1MGOMAG COAT 85% START
104.1TFCCapped
34.5SAMSVERE AGG
2SSSPEELING CONCRETE SEVERE AGG ATTCHED
153.1TFCCapped
0MWL
249.4FLSLIGHGT
55.8TFCCapped
305.2SAMSEVERE AGG

Properties (4)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTCHED
custom_field_two
2
customer
LACSD
datetime
2018-02-16T00:57:04-08:00