- Date
- 02/16/2018
- W/O
- #
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00003
- PipeID
- P00422
- Time
- 5:17 AM
- Certificate
- U-1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0741
- Sewer Name
- 08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
- City
- CARSON
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 08
- Page No.
- 12
- Purpose
- Routine Assessment
- Project
- 20180216MDM_DAVIDSON_CITY_TRUNK_SECTS_1_2_3
- Material
- NRCP
- Shape
- Circular
- Height
- 18 in.
- Upstream MH
- 08 0369
- Downstream MH
- 08 0370
- Dir. of Survey
- Upstream
- Length Surveyed
- 141.8 ft.
- Total Length
- 141.8 ft.
- Structural Index
- 3
- Structural Quick
- 3121
- Structural Rating
- 5
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 7
Pipe schematic from manhole 08 0369 to 08 0370 Observation photos (1)

2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG