Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 15, 2018, 06:06 PM
  • 08 0374_08 0373_2152018_101050.mp4

Date
02/15/2018
W/O
0690350
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00003
PipeID
P00428
Time
10:06 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7633
Sewer Name
08 DAVIDSON CITY TRUNK, SECTS 1,2,&3
City
CARSON
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
12
Purpose
Routine Assessment
Project
20180215DF_DAVIDSON_CITY_TR_SECTS_1_2_3
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
08 0375
Downstream MH
08 0376
Dir. of Survey
Upstream
Length Surveyed
150.2 ft.
Total Length
150.2 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 08 0375 to 08 0376
MH: 08 0375MH: 08 0376upstream0 ft. AMH - Upstream Manhole, Survey Ends - 10:31 AM3.4 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active3.4 ft. RFJ - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YESR, Finish3.4 ft. MGO - General Observation - Grease Throughout The Reach (5%)3.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish41.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"56.4 ft. RFJ - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YESR, Start - 10%68.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"72 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Finish75.6 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR, Start - 10%79.7 ft. MGP - General Photograph92.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"99.5 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish101.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open125 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"133.9 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start143.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"148.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start150.2 ft. AMH - Downstream Manhole, Survey Begins - 10:10 AM150.2 ft. MWL - Water Level, 35 %of cross sectional area150.2 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (1)

  • Deposits Attached Ragging, 5 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    16.3 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
74.6RFJ10%
70.5MGP
150.2AMH10:31 AM
50.7DAR
0AMH10:10 AM
25.2TFC
58.1TFC
78.2RFJ
16.3DAR
109.1TFC
0MWL
146.7SSS
48.8TFOpen
146.8MGOConn. @ Mh, 3 O' Clock. Active
2SSS
6.9TFC
82TFC
0MWM
146.8RFJ
146.8MGOGrease Throughout The Reach (5%)
93.8RFJ10%

Properties (4)

additional_info
PIPE ID ON SCREEN IS WRONG. CORRECT ID # IS (P00428)
custom_field_two
3
customer
LACSD
datetime
2018-02-15T10:06:56-08:00